House Construction Cost Calculator

Get an itemised estimate for building your home in Lahore. Configure plot size, stories, contract type, and quality to see full material & labour breakdowns.

Plot Configuration

Plot area: 1,575 Sq Ft

Covered Area (approx.)2,205 Sq Ft
Rate (per Sq Ft)Rs. 4,200
Estimated Total92.61 Lac
Estimated Total Construction Cost
92.61 Lac
PKR 9,261,000
Lahore7 Marla2 Stories
Complete HouseTurnkey
Standard A2,205 Sq Ft covered

Itemized Cost Breakdown

Structure
Excavation & Foundation8%

Soil excavation, sub-base, footings, and waterproofing of foundation.

7.41 Lac
PKR 740,880
Bricks, Cement, Sand & Crush16%

All masonry and concrete materials for walls, columns, beams, and slabs.

14.82 Lac
PKR 1,481,760
Steel Rebar (Saria)13%

Grade 60 steel for structural integrity of Foundation, Columns & Slabs.

12.04 Lac
PKR 1,203,930
Services
Plumbing & Sanitary (Full)8%

Full plumbing including imported sanitary fixtures, commodes, basins, and geysers.

7.41 Lac
PKR 740,880
Electrical (Full)8%

Wiring, DBs, sockets, fans, lights, MCBs, and panel board installation.

7.41 Lac
PKR 740,880
Finishing
Flooring & Tiles12%

Porcelain and ceramic tiles for bathrooms/kitchens, marble or granite for lounge.

11.11 Lac
PKR 1,111,320
Woodwork & Doors12%

Main door (solid wood), flush doors, wardrobes, kitchen cabinets, and trusses.

11.11 Lac
PKR 1,111,320
Paint & Plaster7%

Internal and external plaster finishing, weather coat, and 2-coat paint.

6.48 Lac
PKR 648,270
Windows & Glazing7%

Aluminum or UPVC windows, glass work, and external cladding.

6.48 Lac
PKR 648,270
Labor
All Labor Charges9%

Full turnkey labor from excavation through to final paint and cleaning.

8.33 Lac
PKR 833,490
Cost Distribution
Excavation & Foundation
8%
Bricks, Cement, Sand & Crush
16%
Steel Rebar (Saria)
13%
Plumbing & Sanitary (Full)
8%
Electrical (Full)
8%
Flooring & Tiles
12%
Woodwork & Doors
12%
Paint & Plaster
7%
Windows & Glazing
7%
All Labor Charges
9%

Disclaimer: These are estimated rates based on 2026 average market rates for Lahore. Final costs may vary significantly due to design complexity, material brands, site accessibility, contractor margin, and inflation.

Construction Rates in Pakistan

Planning to build a house in Pakistan? Estimating the total construction cost can be challenging given the fluctuating rates of raw materials like cement, steel, bricks, and sand. Our construction cost estimator provides an accurate breakdown of the total expenditure so you can manage your budget effectively.

Understanding the Breakdown

  • Grey Structure: The foundational core of the house. Includes excavation, brickwork, pouring slabs, basic electrical conduit laying, and plumbing.
  • Finishing Work: The visible aesthetics of your home. Includes flooring/tiles, wooden doors, kitchen cabinets, paint, windows, electrical fixtures, and sanitary ware.
  • Material vs Labour: A turnkey (with material) contract covers everything, saving you hassle. A labour-only contract requires you to procure and transport all building materials yourself.